Over the weekend of 2&3 December 2023, seven BAREG members conducted fall buoy operations and retrieved the U-1105 mooring buoy from the wreck site and returned it to Tall Timbers Marina for cleaning and maintenance.

BAREG buoy ops requires detaching the mooring chain and carefully lowering it to the river bottom. Unlike the non-technical dive group that previously did this work, BAREG’s technical divers use their dive training and planning skills to avoid dropping the mooring chain on the U-boat and potentially damaging the wreck. For BAREG, protecting the historic U-boat is second only to diver safety.

U-1105 fall buoy operations

WBA

Related Posts

  • Nine BAREG divers aboard Huskyan after loading our gear upon arrival in Stromness.
  • Nine BAREG divers aboard Huskyan after loading our gear upon arrival in Stromness.

BAREG Update Late Summer 2026

By |September 4, 2026|

U-853 – 25 & 26 JUL Four BAREG divers traveled to Rhode Island for our group's second 2026 trip to the U-853. As with the earlier trip in July, our divers dove from the F/V [...]

  • BAREG divers Bill A., Brett S., Kevin M., Matt G., and Brian W. Photos by Ops Coordinator.
  • BAREG divers Bill A., Brett S., Kevin M., Matt G., and Brian W. Photos by Ops Coordinator.

Bareg Summer Update 2026

By |July 23, 2026|

Based on our inspection of the U-1105 mooring buoy chain in late May, BAREG divers returned to the site on 5 JUL and attached two ½ inch jumper chains around sections of old chain that [...]

  • Buoy on station for 2026 dive season. Diver floats and temporary ball visible upriver.
  • Buoy on station for 2026 dive season. Diver floats and temporary ball visible upriver.

BAREG Update II Spring 2026

By |May 31, 2026|

On Monday, 25 May, four BAREG divers conducted working dives to closely inspect the U-1105 mooring buoy chain. When we placed the buoy on station in April we noticed the chain had corroded since [...]