Three BAREG divers, supported by three M/V My Purpose Holds boat crew, retrieved the U-1105 wreck site mooring buoy from its station in the lower Potomac River. Weather was fair topside, water T was 41 degrees F, and seas were running one to two. Current picked up during the dives generating turbidity clouds and dispersing the divers as they made SMB ascents. The buoy will receive a major overhaul before it’s put back on station in the spring. After landing the buoy we regrouped and warmed up for dinner: locally caught rockfish and crab cakes, and unknown origin sausages (WTF?, well, there’s always one outlier).

The BAREG Buoy Ops Team is a cadre of experienced technical wreck divers that specialize in working in cold water, strong current, and dark, low viz conditions. These divers are selected for the team because they get the job done despite the cold and dark, and because they can problem solve underwater in adverse conditions.

This concludes BAREG dive operations for 2024. It was a really good dive year, as we’ll review at our symposium on 25 JAN. Thanks to all the BAREG divers who dove with us this year and to all BAREG members for their continued support.

Dinghy under tow

Image 2 of 4

Fred Engle
Ops Coordinator BAREG
Master M/V My Purpose Holds

WBA

Related Posts

  • Nine BAREG divers aboard Huskyan after loading our gear upon arrival in Stromness.
  • Nine BAREG divers aboard Huskyan after loading our gear upon arrival in Stromness.

BAREG Update Late Summer 2026

By |September 4, 2026|

U-853 – 25 & 26 JUL Four BAREG divers traveled to Rhode Island for our group's second 2026 trip to the U-853. As with the earlier trip in July, our divers dove from the F/V [...]

  • BAREG divers Bill A., Brett S., Kevin M., Matt G., and Brian W. Photos by Ops Coordinator.
  • BAREG divers Bill A., Brett S., Kevin M., Matt G., and Brian W. Photos by Ops Coordinator.

Bareg Summer Update 2026

By |July 23, 2026|

Based on our inspection of the U-1105 mooring buoy chain in late May, BAREG divers returned to the site on 5 JUL and attached two ½ inch jumper chains around sections of old chain that [...]

  • Buoy on station for 2026 dive season. Diver floats and temporary ball visible upriver.
  • Buoy on station for 2026 dive season. Diver floats and temporary ball visible upriver.

BAREG Update II Spring 2026

By |May 31, 2026|

On Monday, 25 May, four BAREG divers conducted working dives to closely inspect the U-1105 mooring buoy chain. When we placed the buoy on station in April we noticed the chain had corroded since [...]